Brettell Lane Ensuite Refit

Heating & Plumbing since 1985.

Brettell Lane Ensuite Refit

29th March 2019 Bathrooms Refurbs Plumbing 0


This ensuite was a tricky one. An old cottage, no wall level or square and the floor ran out by over an inch! Due to the ensuite being fully tiled, we took little more time on the prep by over boarding walls square and level. This also allowed the fitted furniture to sit in square, without having to cut end panels or worktop to suite. The customer wanted the new shower tray to be sat flush on the floor, instead of being raised; this was done by first having to move the main central heating flow and return and reinforce a joist that was had to take a little out of, to allow for the waste.

Main points:

  • Fully boarded.
  • Fan, Shaver Socket & New Light
  • Fully tiled floor to ceiling.
  • Floor tiled.
  • 1200 x 800 offset shower tray.
  • Fitted furniture.
  • Wall hung cabs with miror.